Here’s what’s new in version 23.0.0.9220 of CCC ONE® Estimating for Repair Facilities.
Note: The availability of the features listed below may vary based on the products licensed by your company.
Diagnostic Operations
Double-clicking an item under Diagnostic Operations now adds the line with the “Sublet” operation. You can still add these items with “Repair” or no operation by using the buttons in the MOTOR tab toolbar.
Figure 1
Receipt Attachments
Companies using CCC® Payments no longer need to add an attachment when selecting Pay Now on a new receipt. Only payment types configured for CCC® Payments apply. All other payment types continue to require attachments based on Required Fields settings.
Figure 2